I saw a post on another forum about this very thing recently. Rate had gone from 41p/kwh to £1.23.
There was some speculation that they might have started charging that kwh rate and multiplying it by the number of phases serviced (£0.41 x 3 = £1.23) ____________________ a.k.a 'Geri'
132.9mph off and walked away. Gear is good, gear is good, gear is very very good  |
|
Back to top |
|
You must be logged in to rate posts |
|
 |
WD Forte |
This post is not being displayed .
|
 WD Forte World Chat Champion

Joined: 17 Jun 2010 Karma :   
|
|
Back to top |
|
You must be logged in to rate posts |
|
 |
A100man |
This post is not being displayed .
|
 A100man World Chat Champion

Joined: 19 Aug 2013 Karma :   
|
|
Back to top |
|
You must be logged in to rate posts |
|
 |
The Artist |
This post is not being displayed .
|
 The Artist Super Spammer

Joined: 06 Jan 2008 Karma :  
|
|
Back to top |
|
You must be logged in to rate posts |
|
 |
doggone |
This post is not being displayed .
|
 doggone World Chat Champion

Joined: 20 May 2004 Karma :    
|
|
Back to top |
|
You must be logged in to rate posts |
|
 |
The Artist |
This post is not being displayed .
|
 The Artist Super Spammer

Joined: 06 Jan 2008 Karma :  
|
|
Back to top |
|
You must be logged in to rate posts |
|
 |
tatters |
This post is not being displayed .
|
 tatters Exxon Valdez

Joined: 04 Jan 2004 Karma :   
|
 Posted: 17:04 - 13 Feb 2023 Post subject: |
 |
|
A utility suppliers three phase meter should be reading and totalling from all three phases. This is required as there will always be unbalance of current draw from each phase, as you mentioned the use of single phase equipment.
I have in the past with PLCs with limited I/O space added metering to three phase equipment using only one current transformer on one phase, and then calculated the other two phases but this only worked as the current draw from all three phases were constantly the same. No way this would be acceptable for buildings main meter. ____________________ Past:NRG50,AF1125(x2),NSR125RR,ZZR250,CX500,VFR400,KR1S,ZZR600(x2),CB400N,YZF1000(x2),KH125,Z200,FX400R,CBR954RR(x2)GPZ500S,GT550,VFR750F(x2),RD350N,XR650R,CBR600F,CB250,KDX250,YZF750R,CRM250,400EXC,KLR650,TTR600RE,DR350S,R100GSPD,RGV250,VMAX1200,DL650,KZ750 Present:G650XC,C12,CRF450X,1190ADV |
|